Sunday, April 25, 2010

Week 4

Its already week 4, i left with another 8 weeks of internship in SapuraCrest(uish, lama lg nk hbs ni)

ok guys, as usual, my job here is never ending with design. Now i was given a task to give dimension on a tank for a platform. I don't think so i'm gonna like this assignment, this involve with one part being assigned dimension, it sounds easy but u should look at the drawing, i thought a tank is simple, just 4 sides of steel panel welded together, but turn out to be there are lots of reinforcement inside of the tank to make sure that it can hold the weight of the fluid inside of it and to prevent excessive amount of stress on the welded joint. And again, there are few things that i need to do which is, the general dimension, then the flanges position and the size used, and the reinforcement of the tank. everything must be separated accordingly since we need to make sure that the manufacturer can understand the drawing. Then i need to specify the lifting lug dimension. FYI lifting lug is a part that will support the tank when it is bolted on the platform. We need to calculated the suitable size in order to avoid failure. I guess this the only thing that i'm gonna do today.

No comments:

Post a Comment